One of the major risks in drafting contracts for the construction of hydropower projects is the failure to impose clear obligations on the “Host State” (the state in whose territory the project is implemented), in accordance with international water law, requiring the Host State to undertake the procedures falling within its sovereign and legal jurisdiction, such as:
Issuing prior notification to riparian states and conducting a transboundary environmental impact assessment (ESIA), while holding the Host State responsible for the contractual consequences arising from a suspension of the project if such suspension results from its failure to fulfill these obligations. This provision carries significant strategic implications for the project’s implementability.
Major construction companies often face substantial risks due to several contractual and hydrological misconceptions, most notably:
1- Lack of awareness of the project’s legal and hydrological scope, based on the assumption that the project is “purely domestic,” while overlooking the fact that the project may become subject to international law simply because it is hydrologically connected to an international watercourse, or because it is located within the recharge area of a transboundary aquifer.
2- Failure to properly examine regional agreements and overlooking the relevant regional treaties and joint water management bodies, which may issue decisions affecting the project’s legality or implementability, or requiring its modification or suspension.
3- Relying primarily on domestic investment laws and drafting contracts and assessing risks independently of international law rules, even though such laws alone are not sufficient to protect the project against regional disputes and the risk of its suspension.
4- Overlooking the risks of international financing being suspended, as development finance institutions may refrain from financing projects that may involve unresolved transboundary disputes, regardless of their economic viability.
Protecting major infrastructure projects therefore goes beyond economic feasibility and investment contracts. It requires carefully drafted contractual arrangements that allocate international sovereign risks with awareness and precision.
💡 Question for experts and investors: Have you ever managed a “domestic” project that suddenly faced transboundary water disputes or financing freezes?
#ProjectFinance#TransboundaryWaters#InternationalWaterLaw#Dams#RiskManagement#Infrastructure#Hydropower#WaterSecurity#DrWaelFathy